Send Message
Home ProductsPanel Furniture Production Line

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified

Certification
China Foshan Hold Machinery Co., Ltd. certification
China Foshan Hold Machinery Co., Ltd. certification
I'm Online Chat Now

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified
Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified
Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified

Large Image :  Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified

Product Details:
Place of Origin: Guangdong China
Brand Name: HOLD
Certification: CE
Model Number: Automatic Production Line For Panel Furniture
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: Negotiable
Packaging Details: Poly Wrapping Or Wood cases
Delivery Time: 45 Days
Payment Terms: LC/ TT
Supply Ability: 10 Set / Month

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified

Description
Production Capacity: Customize Min.Processing Size: >=300mm *300mm
Fuctions: Wood Panel Edge Banding Delivery Time: 45 Days
Power Voltage: Customize
High Light:

Auto Woodworking Edge Banding Machine CE certified

,

Panel Furniture Production line CE certified

,

Automatic Edgebander CE certified

Automatic Production Line For Panel Furniture

 

Configuration: Gantry robot  loading+Two double edge bander+Two multi drilling machine+Gantry robot unloading. 

 

Features

 

1. This is supper edge banding and Drilling production line for mass production. 

2. With the gantry robot loading system, workers just need to put all the panels on the roller liffing table , the system will automatically load the panel into the production line. 

3. Two double side edge bander means just need one cycle to finish four side edge banding. 

4. The multi drilling machine line means you can finish the four side Drilling for the panel at one time . 

5. Very high efficiency for medium side and small size artificial board processing. 

6.  It is a specially built production line for panel furniture manufacturers

7. Just need 2~4 people to maintain and operate this production line, greatly reduce the labor cost. 

8. Easy to operate and maintain . 

 

Below are some photos of our project 

 

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 0Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 1Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 2Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 3Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 4

 

Click on the link below to watch more videos of automated production lines

 

Auto Woodworking Edge Banding Machine Wardrobe Panel Furniture Production Line CE Certified 5


About our company

One-stop solution for interior furniture equipment and wooden door equipment

HOLD Machinery was founded in 2004, focusing on the development of a full range of furniture machinery equipment and wooden door machinery and equipment, providing furniture and wooden door enterprises with solutions for whole factory planning and automatical production lines, providing customers with excellent quality, efficient and stable products, and high-quality service.

HOLD Machinery has served the majority of furniture and wooden door enterprises in more than 40 countries and regions around the world and has won wide admiration from customers.


FAQ:

1. Do you have the machine in stock?
Sorry, we don't have the machine in stock, edge banding machine has many options such as voltage, speed, function, and so on, So it's hard to prepared samples.

2. How long is your delivery time?
For our standard model, the delivery time is around 1.5~2 months. For the customized model, the delivery time is around 2~3 months. It depends on the client's project and quantity.

3. Do you have a factory?
Yes, we have our own factory and we promise direct sales at a competitive price. Welcome to visit our factory at any time.

 

 

Contact Details
Foshan Hold Machinery Co., Ltd.

Contact Person: Miss. Hong

Tel: +86-18029386958

Send your inquiry directly to us (0 / 3000)